Distribution power transformer has large number of turns test
possible that to turn might internally short circuit, which is
not easily traceable. To detect teh fault, twice voltage is
applied to the transformer winding and at twice frequency to
maintain the magnetising of the current with in limits. The
nodded of the current of the transformer is measured before
and after the test. If remain same the winding is O.K. If the
nodded is increased, the winding is faulty.